Featured Project

Ash Pond Closure

Saiia contracted directly with the utility company to close a 70+ acre ash impoundment. The scope of work included dewatering, dry-ash stacking, mixing wet and dry ash, dust control, water treatment, closure turf system installation, and storm drainage piping. Saiia excavated and relocated more than 600,000 cubic yards of ash to successfully complete the project.

All Projects