Ash Pond Closure by Removal

Coal Combustion Residuals Management

Ash Pond Closure by Removal

Saiia contracted directly with a utility to dewater, excavate, moisture condition, load, haul, place, compact, and cover more than 750,000 cubic yards of material. The 25-acre impoundment was excavated to depths of approximately 40 feet. Once the area was completely free of CCR, a final earthen cover system was installed and the area hydroseeded and mulched.